Jacksonville's City Council has a bill in front of it that pulls $900,000 from General Fund Operating Reserves and hands it to one nonprofit, WareWorks, Inc., for an electrical apprenticeship training center. Ordinance 2026-809 also sets aside the city rule that puts nonprofits through a scored competition for grant money, so the city can sign with WareWorks directly. The public hearing is set for Tuesday, Oct. 27. That's the night you can stand up and say something about it.

Nobody has voted on it yet. Per the council's record, all three committees it went to read it a second time and re-referred it on Oct. 19 and 20.

So we're going to ask the two questions this show always asks. Who decided this money should skip the line? And who gets paid?

The Receipt

Council Member Rory Diamond introduced the bill on Oct. 13. The Council Research Division's summary says the bill moves $900,000 from General Fund Operating Reserves to WareWorks to fund its Electrical Apprenticeship Training Center Program, and it sends the bill to three committees: Rules, Neighborhoods and Finance. WareWorks would run the program with the Independent Electrical Contractors Florida First Coast Chapter. Per the summary, WareWorks supplies the building and runs outreach and recruiting. The contractors' group writes the curriculum, supplies the instructors and technical guidance, and connects trainees to the electrical contractors who hire apprentices.

Then comes Section 3. It waives Section 118.107 of the Ordinance Code, the rule titled "Nonprofits to receive funding through a competitive evaluated award process," to "allow for a direct contract with WareWorks." The stated justification is that WareWorks "has identified and will outfit an appropriate facility" and will partner with the Independent Electrical Contractors Florida First Coast Chapter to meet the city's demand for electricians. That's the whole reason given.

The grant runs from Oct. 1, 2026, through Sept. 30, 2027. The mayor, or her designee, signs it, and the Finance Department's Grants and Contract Compliance Division oversees it.

Here's the budget, from the summary. Of the $900,000, $380,000 is "apprenticeship instruction and facility operations," $325,000 is "the Mobile Learning Lab and electrician simulation," $140,000 is training equipment, $35,000 is curriculum and $20,000 is outreach. WareWorks puts in $150,000 of its own for the permanent improvements to the space, which the term sheet puts at "approximately 5,000 square feet" at 11711 Marco Beach Drive. Money goes out "against four payment milestones on a reimbursement basis."

The waiver comes with a sworn form. The disclosure affidavit the code requires answers no to both questions about elected officials and city executives on staff or on the board. It's handwritten. WareWorks' director of partnerships signed it, the "No" box is checked on both questions, and a notary acknowledged it in Duval County on Aug. 19.

Why It Costs You

First, the source. This isn't a grant line nonprofits apply to. It's the city's operating reserve.

The competition the bill waives is how a group that isn't already in the room gets a shot at city money. Waive it and nobody else gets scored against WareWorks for this $900,000. That's every other outfit in Jacksonville training people for the trades, and it's you, because it's your reserve.

The city is carrying most of this program. The term sheet's own budget page puts the whole thing at $1,050,000, with the city's $900,000 as 85.7 percent of it and WareWorks' $150,000 as the rest.

And it isn't the only one. The council's record lists Ordinance 2026-810, introduced the same night, Oct. 13, also by Diamond, also from General Fund Operating Reserves, with the same waiver language: $2 million to Junior Achievement of North Florida. This show read that bill on Oct. 10. Add the two together and that's $2.9 million out of the reserve, our math, with the competition waived both times.

How the Machine Works

Here's how the $900,000 leaves the building. The term sheet sets four milestones, and each one pays a maximum only against paid invoices and program paperwork. Milestone 1 is up to $175,000 for training equipment and materials, and it also asks for proof of an executed lease for the program space. Milestone 2 is up to $325,000 for the Mobile Learning Lab. Milestone 3 is up to $20,000 for outreach and recruitment. Milestone 4 is up to $380,000: occupancy costs up to $125,000, and contractual services from the electrical contractors' group up to $255,000.

Now here's the part the summary's budget doesn't show you. Split the $380,000 line into the two things it holds, and the biggest single use of this money isn't the apprenticeship classes. It's the $325,000 Mobile Learning Lab. Per the term sheet, the Lab is WareWorks' own: simulators, software and virtual-reality gear that WareWorks runs "through its Mobile Learning Lab and related WareWorks programming" to show Duval County residents what electrical work looks like and steer the interested ones toward training. That's career exploration, run by WareWorks. The trade group's contractual services, instruction included, top out at $255,000. The Lab line is $70,000 bigger, our math.

Then the rent. The budget page carries $125,000 for occupancy, and the term sheet says that covers the training space plus utilities, internet, cleaning, security and other facility services. The training space is at 11711 Marco Beach Drive. On the affidavit, that's also the address WareWorks lists as its own. The term sheet says WareWorks lined up a 135,000-square-foot facility in the year before it asked. None of the documents filed with the bill say who owns the building, who the lease is with, or who collects the occupancy money. That's a question, not an accusation, and it's the kind a competition would have asked.

The budget can move, too. The term sheet lets the city's grant administrator amend it, and only a substantial change, or a change outside 10 percent of a budget line, has to come back to the council.

Watch the dates. The term sheet's budget page is marked "Updated: 7/13/26." The affidavit was notarized Aug. 19. The bill was introduced Oct. 13 for a grant term that starts Oct. 1. And by the term sheet's own account, this is a new initiative; WareWorks didn't run this program the year before.

One disclosure belongs on the table. News4Jax describes its skilled-trades series, which ran an apprenticeship story Oct. 21, as "an ongoing News4JAX series in partnership with WareWorks." The station prints that line on the story itself.

The Strongest Version of the Other Side

Here's the best case for the bill, and it's the one in the bill. The city needs electricians. The money pays out only against verified costs, milestone by milestone. A trade association supplies the curriculum and the instructors. The term sheet says no city money goes to permanent construction, WareWorks covers the $150,000 buildout itself, and WareWorks sends the city monthly reports. It plans a first cohort of up to 30 apprentices and at least 1,000 residents reached through the Lab, outreach and the program. A competition takes time, and an apprentice who starts this year is an electrician sooner.

That's a real argument, and here's where it runs out. A good program can win a competition. That's what the competition is for. Having a building and a partner is what a strong applicant brings to the process. It isn't a reason the process can't happen. And reimbursement controls how the money leaves. It doesn't decide who should get it in the first place.

What You Can Actually Do

Read the bill and its exhibits. The bill, the term sheet and budget, the affidavit. They're short, and every figure in this piece is in them.

Speak on Oct. 27. The matter title sets the public hearing for Oct. 27. When we checked the council's meeting calendar on Oct. 22, the agenda for that night hadn't posted; the newest meeting listed was an Oct. 23 committee. Check it before you go for the time and the room.

Ask three questions, out loud or in writing. Why does a program with a building and a partner need the competition waived? Who holds the lease at 11711 Marco Beach Drive, and who collects the $125,000? Why does a WareWorks simulation lab get more than the apprenticeship instruction?

Ask the same of the other one. The Junior Achievement bill, 2026-810, has its hearing listed for the same night.

The So-What

None of this breaks a rule. The waiver is in the rule's own title. That's the design: the competition exists until somebody waives it, and the council can waive it one bill at a time.

Two waivers from the same reserve, from the same introducer, on the same night of introductions. $2.9 million that nobody else got to compete for. If you want the default to stay the default, Oct. 27 is when you say so.

Come back for the rest

We do this every week. The official framing on top, the receipts underneath, every figure traced back to the document it came from so you can go open it yourself and check my work. Pull up a chair, pour something cold, and let us send you the receipts before the next quiet robbery clears the courthouse. Subscribe to The Long Pour. The free newsletter where the week's little robberies and the one big one land in your inbox together.

Y'all come back, now.


The Receipts

Each claim above links to a document you can open yourself, with the access date on each line.